Our Morgan Stanley marble and carpet project has been completed and inspected! This project was a little challenging because it was located on the 10th floor and the tile cutting had to be done in the loading dock. The problem with that, was that the loading dock was basically outside and with freezing temperatures, the tile cutter kept freezing. Of course, we could only work on this project between 4:30 p.m. and 8 a.m. which is the coldest time of the day! And of course, let’s not even get into the badges and access to the elevators! The Morgan Stanley marble and carpet project may have had its challenges, but we had fun and really appreciated the opportunity.

-The BCR Team 🙂